Under Development

Office Projects

AFI Tech Park

About

AFI Tech Park

AFI Tech Park is a modern business park totaling aprox. 70,000 sqm GLA. The project will comprise of 3 office buildings, surrounded with ample green areas, added to an IT&C campus style environment in an urban complex with a central plaza & gardens.

The project provides the tenants all the high technical specifications they need and expect from all AFI Europe projects.

Phase A was delivered in Q3, 2018, consisting of an office building with 22,000 sqm GLA and 33,000 sqm GBA and 220 underground parking places. AFI Tech Park 1 encloses approx. 2,000 sqm of retail area located at the Ground Floor, hosting World Class gym (1,500 sq m) and Quick Service Restaurant “1 Minute” (110 sq m), Canteen and other facilities.

Phase B is currently under construction and expected to be delivered in 2021, while phase C is planned to be developed during 2021.

The office park will offer a total leasable area of 70,000 sqm GLA (95,000 sqm GBA).

AFI Tech Park will provide 1,000 parking places, 5 000 sqm green areas with water elements perfectly integrated to enhance the identity of the business park.

A shuttle bus is dedicated exclusively to the tenants of the office park, connecting them directly to the metro station Unirii Square.

http://afitechpark.ro/

 

Fact Sheet

Completion date  2018 (Phase A)
2021 (Phase B)
2022 (Phase C)

Gross Built-Up Area (GBA) 95,000 sqm

Gross Leasable Area (GLA) 56,000 sqm

Parking Spaces 1,000

Sustainability Certified LEED Platinum

AFI Tech Park

Accessibility

AFI Tech Park benefits from close proximity to J.W. Marriott Hotel (600 m), Unirii Square, the Old City and the Romanian Parliament (800 m). AFI Tech Park can be reached via 2 main traffic arteries, Progresului and Tudor Vladimirescu Boulevards, each with 4 lanes that allow smooth traffic flow.

The excellent position makes driving from anywhere in the city accessible in the shortest time possible. Five tram lines stop at the entrance of the project, with the highest frequency in Bucharest: a tram arrives every 3 minutes, while the currently under construction Academia Militara metro station will add direct connectivity to the project.

Contact

AFI TECH PARK
29th Tudor Vladimirescu Str., 5th District, Bucharest city, Romania

Emma Toma
Head of Office Division
+40 21 412 02 20
emma.toma@afi.global

www.afitechpark.ro